{"id":668151,"date":"2025-05-09T18:45:21","date_gmt":"2025-05-09T15:45:21","guid":{"rendered":"https:\/\/en.buradabiliyorum.com\/google-inks-deal-to-develop-1-8-gw-of-advanced-nuclear-power\/"},"modified":"2025-05-09T18:45:21","modified_gmt":"2025-05-09T15:45:21","slug":"google-inks-deal-to-develop-1-8-gw-of-advanced-nuclear-power","status":"publish","type":"post","link":"https:\/\/buradabiliyorum.com\/en\/google-inks-deal-to-develop-1-8-gw-of-advanced-nuclear-power\/","title":{"rendered":"Google inks deal to develop 1.8 GW of advanced nuclear power"},"content":{"rendered":"<div>\n<p id=\"speakable-summary\" class=\"wp-block-paragraph\">Google and nuclear site developer Elementl Power announced this week that they will work together on three sites for advanced nuclear reactors.<\/p>\n<p class=\"wp-block-paragraph\">The tech company has been rushing to lock up energy sources as its AI ambitions drive growing power demands at its data centers. This year alone, Google plans to spend $75 billion building data center capacity.<\/p>\n<p class=\"wp-block-paragraph\">With the new deal, Google is promising to add at least 600 megawatts of generating capacity at each of the three sites. Elementl said the reactors will be connected to the grid \u201cwith the option for commercial off-take,\u201d meaning that Google can buy power directly.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">Elementl has been operating stealthily until this announcement. The team has experience in the nuclear industry, though it hasn\u2019t developed any power plants yet. The company was started by Breakwater North and is backed by Energy Impact Partners.<\/p>\n<p class=\"wp-block-paragraph\">Elementl is taking a \u201c<a href=\"https:\/\/buradabiliyorum.com\/en\/category\/technology\/\" data-internallinksmanager029f6b8e52c=\"4\" title=\"Technology\" target=\"_blank\" rel=\"noopener\">technology<\/a> agnostic\u201d <a href=\"https:\/\/buradabiliyorum.com\/en\/category\/download-scripts-themes-apps\/\" data-internallinksmanager029f6b8e52c=\"9\" title=\"Download Scripts &amp; Themes &amp; Apps\" target=\"_blank\" rel=\"noopener\">app<\/a>roach, meaning that it hasn\u2019t decided on which small modular reactor (SMR) company it will work with to develop the projects. There are a number of possibilities, though Kairos Power is a likely frontrunner given its existing deal with Google.<\/p>\n<p class=\"wp-block-paragraph\">Kairos <a rel=\"nofollow\" target=\"_blank\" rel=\"nofollow\" href=\"https:\/\/kairospower.com\/technology\/\">says<\/a> its demo plant will generate 50 megawatts of electricity, with an eventual commercial plant producing 150 megawatts split between two reactors.<\/p>\n<p class=\"wp-block-paragraph\">There\u2019s no universally accepted definition, but SMRs tend to top out at 300 megawatts or so. By comparison, the most recently completed nuclear power plant in the U.S., Vogtle Unit 4 in Georgia, generates over 1.1 gigawatts of electricity, nearly four times the size of a large SMR.<\/p>\n<div class=\"wp-block-techcrunch-inline-cta\">\n<div class=\"inline-cta__wrapper\">\n<p>Techcrunch event<\/p>\n<div class=\"inline-cta__content\">\n<p>\n\t\t\t\t\t\t\t\t\t<span class=\"inline-cta__location\">Berkeley, CA<\/span><br \/>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"inline-cta__separator\">|<\/span><br \/>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"inline-cta__date\">June 5<\/span>\n\t\t\t\t\t\t\t<\/p>\n<p>\t\t\t\t\t<span>BOOK NOW<\/span><\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p class=\"wp-block-paragraph\">Silicon Valley has been smitten by SMRs. Startups have been rushing into the space, promising to slash reactor costs through mass manufacturing enabled by SMRs\u2019 smaller size. That, coupled with the promise of 24\/7 power that could be sited close to data centers, has pushed them to sign a number of deals with SMR startups, including Oklo, X-Energy, and the aforementioned Kairos.<\/p>\n<p class=\"wp-block-paragraph\">Yet no SMR has been built outside of China. One startup, NuScale, has gotten close to building one, but it <a rel=\"nofollow\" target=\"_blank\" rel=\"nofollow\" href=\"https:\/\/www.utilitydive.com\/news\/nuscale-uamps-project-small-modular-reactor-ramanasmr-\/705717\/\">suffered a setback<\/a> in 2023 when its utility partner canceled its contract after the estimated cost of the project more than doubled \u2014 even as the plans were downsized in an effort to contain costs.<\/p>\n<\/div>\n<blockquote><p><strong><span style=\"color: #ff6600;\">If you liked the article, do not forget to share it with your friends. Follow us on\u00a0<span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/news.google.com\/publications\/CAAqBwgKMN63nwsw68G3Aw\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Google News<\/a><\/span>\u00a0too, click on the star and choose us from your favorites.<\/span><\/strong><\/p><\/blockquote>\n<blockquote>\n<p style=\"text-align: center;\"><strong>If you want to read more like this article, you can visit our <span style=\"color: #ff9900;\"><a style=\"color: #ff9900;\" href=\"https:\/\/en.buradabiliyorum.com\/category\/technology\/\" target=\"_blank\" >Technology<\/a><\/span> category.<\/strong><\/p>\n<\/blockquote>\n<p><span style=\"color: black;\"><a style=\"color: #ff9900;\" href=\"https:\/\/techcrunch.com\/2025\/05\/09\/google-inks-deal-to-develop-1-8-gw-of-advanced-nuclear-power\/\" target=\"_blank\" >Source<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Google and nuclear site developer Elementl Power announced this week that they will work together on three sites for advanced nuclear reactors. The tech company has been rushing to lock up energy sources as its AI ambitions drive growing power demands at its data centers. This year alone, Google plans to spend $75 billion building&#8230;<\/p>\n","protected":false},"author":1,"featured_media":668152,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"https:\/\/techcrunch.com\/wp-content\/uploads\/2024\/10\/GettyImages-531153042.jpeg?resize=1200,800","fifu_image_alt":"","footnotes":""},"categories":[18],"tags":[75885,77143,153835,156257,26293,156258,76151],"class_list":["post-668151","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology","tag-enterprise","tag-climate","tag-data-centers","tag-energy-impact-partners","tag-google","tag-nuclear-fission","tag-nuclear-power"],"_links":{"self":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/posts\/668151","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/comments?post=668151"}],"version-history":[{"count":0,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/posts\/668151\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/media\/668152"}],"wp:attachment":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/media?parent=668151"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/categories?post=668151"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/tags?post=668151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}