{"id":740296,"date":"2026-07-22T13:20:21","date_gmt":"2026-07-22T10:20:21","guid":{"rendered":"https:\/\/buradabiliyorum.com\/en\/a-gas-rich-outback-station-could-host-a-28bn-off-grid-ai-data-centre\/"},"modified":"2026-07-22T13:20:21","modified_gmt":"2026-07-22T10:20:21","slug":"a-gas-rich-outback-station-could-host-a-28bn-off-grid-ai-data-centre","status":"publish","type":"post","link":"https:\/\/buradabiliyorum.com\/en\/a-gas-rich-outback-station-could-host-a-28bn-off-grid-ai-data-centre\/","title":{"rendered":"A gas-rich outback station could host a $28bn off-grid AI data centre"},"content":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/media.thenextweb.com\/2026\/07\/Project-Ares.avif\" \/><\/p>\n<div id=\"article-main-content\">\n<p>On a cattle station deep in the Northern Territory outback, roughly 683km south of Darwin, a Singapore-headquartered developer wants to build one of the largest data centres in the southern hemisphere.<\/p>\n<p>The plan leans on a resource the region has in abundance and the electricity grid does not reach out to supply: gas.<\/p>\n<p>Energy North lodged the proposal, called Project Ares, with Australia\u2019s federal environment department in June, and it is now open for public comment.<\/p>\n<p>The off-grid campus would sit at Murranji Station in the gas-rich Barkly region, near the Beetaloo basin, and run on a mix of\u00a0gas-fired power, solar, and batteries. It arrives as Australian regulators tighten the\u00a0energy rules\u00a0around AI infrastructure.<\/p>\n<p>The numbers are large and, in one important place, unsettled. Energy North expects to invest about AU$11.9 billion in the first phase alone, according to Data Center Dynamics.<\/p>\n<p>Bloomberg, which reported the region\u2019s <a href=\"https:\/\/buradabiliyorum.com\/en\/category\/download-scripts-themes-apps\/\" data-internallinksmanager029f6b8e52c=\"9\" title=\"Download Scripts &amp; Themes &amp; Apps\" target=\"_blank\" rel=\"noopener\">app<\/a>etite for the scheme, put the full project at around $28 billion, a figure that has not surfaced in any other outlet and whose currency and build-out stage the report does not spell out.<\/p>\n<p>The first phase would deliver 1 gigawatt of computing capacity, built in two 500MW stages, with the campus designed to scale beyond 5GW over time.<\/p>\n<p>Powering it would fall to roughly 1,038MW of gas-fired generation, described as hydrogen-ready, alongside 3GW of solar and 16GWh of battery storage.<\/p>\n<p>The data centre halls would occupy about 90 hectares; the site as a whole runs to some 19,150 hectares, with the solar farm alone sprawling across as much as 7,000.<\/p>\n<p>Building behind the meter, entirely off-grid, sidesteps a problem that is starting to bite closer to the coast.<\/p>\n<p>Grid operators have warned that data-centre capacity around western Sydney is close to exhausted, pushing developers inland toward cheap land and, increasingly, dedicated power of their own.<\/p>\n<p>Microsoft\u2019s A$25 billion\u00a0commitment and a run of hyperscale plans have made Australia one of the busier markets in the region, and the Territory, with more sun and space than customers, is now fielding a share of them.<\/p>\n<p>Project Ares has been awarded Commonwealth Major Project Status, which streamlines federal coordination but stops well short of approval.<\/p>\n<p>The Northern Territory Environment Protection Authority is assessing the referral, and the project still needs a decision under the Environment Protection and Biodiversity Conservation Act before it can break ground.<\/p>\n<p>Energy North is owned by Raggiana Global and led by Scott Criddle, a former chief executive of the engineering contractor Decmil.<\/p>\n<p>The company describes itself as an independent Australian green-energy developer, and frames the gas component as a bridge, generation for reliability that is meant to give way to renewables as the site matures.<\/p>\n<p>Nvidia-backed data centres\u00a0elsewhere in the country are making similar promises about cleaning up over time.<\/p>\n<p>The gas itself has a ready source. The Beetaloo basin beneath the Barkly has long been pitched by Canberra as the centrepiece of a gas-led recovery, and a data centre that consumes its own supply on site turns a stranded resource into a customer.<\/p>\n<p>That logic is part of what makes the remote Territory, thinly populated and short on grid, suddenly attractive to hyperscale developers.<\/p>\n<p>It also sharpens the tension in the pitch, since a campus sold on eventually running clean would begin life burning gas at close to a gigawatt.<\/p>\n<p>A final investment decision is targeted for 12 to 18 months after approvals land, with the first phase built in a similar window after that.<\/p>\n<p>Project Ares is one of roughly a dozen data-centre proposals now lodged across the Territory, alongside Energy North\u2019s own Project Sol, a green hydrogen and ammonia venture at an earlier stage.<\/p>\n<p>Whether the outback can host that much computing, on power that is meant to clean up as it goes, is the question the next 18 months will begin to answer.<\/p>\n<\/p><\/div>\n<blockquote><p><strong><span style=\"color: #ff6600;\">If you liked the article, do not forget to share it with your friends. Follow us on\u00a0<span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/news.google.com\/publications\/CAAqBwgKMN63nwsw68G3Aw\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Google News<\/a><\/span>\u00a0too, click on the star and choose us from your favorites.<\/span><\/strong><\/p><\/blockquote>\n<blockquote>\n<p style=\"text-align: center;\"><strong>If you want to read more like this article, you can visit our <span style=\"color: #ff9900;\"><a style=\"color: #ff9900;\" href=\"https:\/\/buradabiliyorum.com\/en\/category\/technology\/\" target=\"_blank\" >Technology category.<\/a><\/span><\/strong><\/p>\n<\/blockquote>\n<p><span style=\"color: black;\"><a style=\"color: #ff9900;\" href=\"https:\/\/thenextweb.com\/news\/australia-28bn-data-centre-project\" target=\"_blank\" >Source<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On a cattle station deep in the Northern Territory outback, roughly 683km south of Darwin, a Singapore-headquartered developer wants to build one of the largest data centres in the southern hemisphere. The plan leans on a resource the region has in abundance and the electricity grid does not reach out to supply: gas. Energy North&#8230;<\/p>\n","protected":false},"author":1,"featured_media":740297,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"https:\/\/media.thenextweb.com\/2026\/07\/Project-Ares.avif","fifu_image_alt":"","footnotes":""},"categories":[18],"tags":[],"class_list":["post-740296","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology"],"_links":{"self":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/posts\/740296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/comments?post=740296"}],"version-history":[{"count":0,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/posts\/740296\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/media\/740297"}],"wp:attachment":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/media?parent=740296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/categories?post=740296"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/tags?post=740296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}