{"id":751889,"date":"2026-11-07T01:50:30","date_gmt":"2026-11-06T22:50:30","guid":{"rendered":"https:\/\/buradabiliyorum.com\/en\/google-takes-over-the-wyoming-data-centre-site-crusoe-had-planned\/"},"modified":"2026-11-07T01:50:30","modified_gmt":"2026-11-06T22:50:30","slug":"google-takes-over-the-wyoming-data-centre-site-crusoe-had-planned","status":"publish","type":"post","link":"https:\/\/buradabiliyorum.com\/en\/google-takes-over-the-wyoming-data-centre-site-crusoe-had-planned\/","title":{"rendered":"Google takes over the Wyoming data centre site Crusoe had planned"},"content":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/media.thenextweb.com\/2026\/11\/google-logo-3d-icon-dark-background.avif\" \/><\/p>\n<div id=\"article-main-content\">\n<p>Google has bought Crusoe\u2019s data centre site in southeast Wyoming and will build the project itself, after pledging $17B there. Bloomberg had reported Crusoe was pushed aside after failing to sign customers. Terms were not disclosed.<\/p>\n<p>Google has bought Crusoe\u2019s data centre site in southeast Wyoming and will build the project itself, Crusoe <a rel=\"nofollow\" target=\"_blank\" href=\"https:\/\/www.crusoe.ai\/resources\/newsroom\/crusoe-wyoming-data-center-campus-update\" target=\"_blank\" rel=\"nofollow noopener\">said on Friday<\/a>. Neither company disclosed the terms.<\/p>\n<p>The deal comes a day after Google said it would spend $17B on its first Wyoming data centre, in Laramie County. It ends Crusoe\u2019s early work on the site, which included choosing the location, winning government <a href=\"https:\/\/buradabiliyorum.com\/en\/category\/download-scripts-themes-apps\/\" data-internallinksmanager029f6b8e52c=\"9\" title=\"Download Scripts &amp; Themes &amp; Apps\" target=\"_blank\" rel=\"noopener\">app<\/a>rovals and planning its power supply.<\/p>\n<p>Crusoe announced the project with Blackstone-backed Tallgrass Energy in July 2025, saying it could eventually grow to 10 GW. In June, Crusoe was being pushed aside after failing to sign customers, with Google raising concerns about costs and timing, <a rel=\"nofollow\" target=\"_blank\" href=\"https:\/\/www.bloomberg.com\/news\/articles\/2026-11-06\/google-takes-over-wyoming-data-center-that-crusoe-had-pitched\" target=\"_blank\" rel=\"nofollow noopener\">Bloomberg reported<\/a>.<\/p>\n<p>Crusoe said it still has more than 6 GW of capacity under contract and over 40 GW in its pipeline. It is also building a data centre campus for Google near Amarillo, Texas, and raised $3.9B at a $30.9B valuation in September. Elsewhere it has landed customers, including deals with Meta in June and a reported $13B contract with Jane Street.<\/p>\n<p>Developers face a tougher climate. Several new governors elected this week have promised to rein in data centres, Bloomberg said, and voters rejected data centres in 40 of 41 local ballot measures.<\/p>\n<\/p><\/div>\n<blockquote><p><strong><span style=\"color: #ff6600;\">If you liked the article, do not forget to share it with your friends. Follow us on\u00a0<span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"https:\/\/news.google.com\/publications\/CAAqBwgKMN63nwsw68G3Aw\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Google News<\/a><\/span>\u00a0too, click on the star and choose us from your favorites.<\/span><\/strong><\/p><\/blockquote>\n<blockquote>\n<p style=\"text-align: center;\"><strong>If you want to read more like this article, you can visit our <span style=\"color: #ff9900;\"><a style=\"color: #ff9900;\" href=\"https:\/\/buradabiliyorum.com\/en\/category\/technology\/\" target=\"_blank\" >Technology category.<\/a><\/span><\/strong><\/p>\n<\/blockquote>\n<p><span style=\"color: black;\"><a style=\"color: #ff9900;\" href=\"https:\/\/thenextweb.com\/news\/google-buys-crusoe-wyoming-data-centre-site\" target=\"_blank\" >Source<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Google has bought Crusoe\u2019s data centre site in southeast Wyoming and will build the project itself, after pledging $17B there. Bloomberg had reported Crusoe was pushed aside after failing to sign customers. Terms were not disclosed. Google has bought Crusoe\u2019s data centre site in southeast Wyoming and will build the project itself, Crusoe said on&#8230;<\/p>\n","protected":false},"author":1,"featured_media":751890,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"https:\/\/media.thenextweb.com\/2026\/11\/google-logo-3d-icon-dark-background.jpg","fifu_image_alt":"","footnotes":""},"categories":[18],"tags":[],"class_list":["post-751889","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology"],"_links":{"self":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/posts\/751889","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/comments?post=751889"}],"version-history":[{"count":0,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/posts\/751889\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/media\/751890"}],"wp:attachment":[{"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/media?parent=751889"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/categories?post=751889"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buradabiliyorum.com\/en\/wp-json\/wp\/v2\/tags?post=751889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}